All site workers or authorized personnel should be dressed in appropriate personal protective wear and be informed of safety practices and emergency procedures. The demolition area should be clearly marked as such to ensure that only authorized personnel are within restricted areas of the site. Post all first aid and CPR equipment with the names of on-site certified individuals. Make sure to name all the local medical or emergency responding facilities and post it in a readily accessible location with phone numbers and addresses. Recycling & Reuse Plan For Green Demolition & Wood Salvage : 1 Form available online. A pre-demolition inspection can help identify environmental issues that need to be addressed immediately or. Demolition Plan is not required at time of application, however, in the event of unusual or challenging site conditions, a detailed Construction Safety Plan and a demolition plan may be required at the discretion of the Building Inspector. In some cases it may be required by regulation. Emergency procedures should be devised, explained, and posted. A pre-demolition inspection may be one of the most helpful and cost-efficient steps you can take to identify materials that should (or must) be removed from buildings prior to demolition. Workers should also know how to respond to possible emergencies. Water to keep material or debris wet to prevent dust from rising.Sidewalk sheds or canopies at all entrances.Safety nets, lifelines, and fall protection.Planning should include necessary safety equipment such as: The demolition contractor is responsible for planning the wreckage of the structure, the equipment to do the work, informing worker of hazards and safety requirements, and public safety. The completed survey must be kept on the job-site and made available upon request. The engineer must complete a written survey to determine if there are any hazardous substances in the structure, and asses the condition of the floors, walls, and framing to prevent a premature collapse. Prior to the Start of a Demolition Project Proper permits and public utility notifications.The planning methods that will be used to bring the structure down.According to OSHA, a qualified person experienced in all phases of the demolition should conduct the demolition planning.Ĭonsider the following when planning any demolition project: Planning for a demolition project is just as important as actually doing the work. In OSHA, OSHA Safety, OSHA Training, Safety, Safety Manual, Safety Talk, Safety Toolbox Talks, Safety Toolbox Topics, Safety Topics, Tailgate Safety, Tailgate Safety Meetings, Tool Box Talk, Toolbox Talk Topics, Toolbox Talks, Toolbox Topics
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |